Here is a drawing of the Ada Drift. Thomas and his team will be on site August 15 to begin re-opening the tunnel.
As shown, the main tunnel is 72 feet in length and the north branch is 33 feet. Also shown are the points that material was taken for assays.

Thank you for the additional information. I appreciate the information on a routine basis to keep us informed.