Mini excavator is onsite to clear the debris from inside the tunnel while we are expecting the bigger excavator to arrive next week to clear the area around the entrance to the Ada Drift.
We are using the mini excavator to clear the debris from the Ada Drift because of the size of tunnel only allows smaller equipment to be used. As part of Phase 1 of the Plan of Operations, we will be able to expand the tunnel’s size to allow larger equipment to be used.