Here is a link to a video of Thomas, Andrew and others doing the initial survey of the mine site and planning the set-up of the equipment. Also, it shows Thomas taking 2 cubic feet , a ton is 15 cubic feet, from what was previously stockpiled and running it through a gold cube to show gold being actually being captured. This video is the first installment from the mine site so we can share with you the progress that is made at Treasure Canyon.
The footage was taken August 21, 2020 at approximately 1:00 pm PDT.
Footage:
(0:51) - Thomas showing newspaper from August 12, 2020
(1:02) - Thomas introducing himself
(1:45) - Thomas with the mine behind him
(5:07) - Thomas showing the Gold Cube working
(9:25) - Thomas provides a recap and what the upcoming plan is