MILESTONES

Our current 10 active mining claims cover 200 acres.  Our priority initially is to rehabilitate the existing “Ada Vein” mining tunnel that produced solid results in the past and begin mining operations by the end of 2020.  The expected output would be 0.25-0.50 oz per ton of raw material.The milestones for the company are as follows:

1.

Rehabilitate the proven existing Ada Vein Drift Tunnel and begin mining production of 5 tons of raw material  per day by the end of 2020.

2.

Increase daily production to 50 tons of raw material per day by June 2021.

3.

Increase daily production to 100 tons of raw material per day by December 2021.

4.

Increase daily production to 200 tons of raw material per day by June  2022.

5.

Increase daily production to 300 tons of raw material per day by December 2022.

6.

Increase daily production to 500 tons of raw material per day by December 2023.

7.

Acquire additional claims around our current 10 claims.